LICAFLEX

Project details

Date:
2023-2024

Categories:
Industrial

Customer:
Licaflex

Location:
Lachine

Mandate:

Construction of a new tower on the building to accommodate the new machinery.

Project description :

The project involved reinforcing the existing building to erect a new tower to accommodate the customer’s recently acquired machinery. The new tower was built on top of the existing building’s roof, requiring careful preparation of the structure to ensure its strength and stability.

Once the structure had been reinforced, we proceeded to unload and install the new machinery, a Macchi, which the customer had purchased to be placed in the bay provided for this purpose. This installation was carried out with great precision, taking into account the technical specifications to ensure optimum positioning of the equipment.

In addition to installing the machinery, we also installed temporary stairs and scaffolding on the building’s roof. These installations provided safe access to the upper part of the tower, facilitating technician intervention and offering a convenient means of accessing equipment at height.

The project was carried out with the utmost rigor, ensuring compliance with all safety standards and seamless coordination between the various stages of the installation. This work enabled the new machinery to be efficiently integrated into the existing infrastructure, while guaranteeing the necessary access for future operations.

Our trusted partners